|
MOQ: | 1 |
Price: | USD 7000USD to 9000USD Each set |
Packaging Details: | Export Standard first packing with shrink film, Next Step packing by wooden case |
Delivery Time: | 45 days |
|
MOQ: | 1 |
Price: | USD 7000USD to 9000USD Each set |
Packaging Details: | Export Standard first packing with shrink film, Next Step packing by wooden case |
Delivery Time: | 45 days |
Hot Drink / Cold Drink Disposable Paper Cup Making Machine With Alarming System
Specification
Model | JBZ-H12 Paper Cup Making Machine |
Paper Cup Size | 3oz-12oz (mold exchangeable) |
Raw Material | One-side PE (polyethylene) film coated / laminated paper Ultrasonic machine can be produce both single and double PE paper |
Suitable paper weight | 140-500gsm |
Productivity | 45-55 pcs/ minute |
Power Source | 220V/380V 50Hz or other required |
Total Power | 4.8KW |
Total Weight | 1500KG |
Package Size(L x W x H) | 2650 * 1300 * 1700 mm |
Working Air Source | 0.4Mpa, Air Out-put:0.6 m3/minute |
Making Double PE coated paper cups, need to buy an air compressor | |
Loading Machine
FCL: paper cup machine with wood tray and plastic film.
LCL: paper cup machine with wood box and plastic film.
We will Spraying oil in paper cup machine for keeping rust away
20” Container Max loading 4 sets Paper Cup Machine
40” Container Max Loading 8 sets Paper Cup Machine
Making Process
Raw Material: PE Coated Paper Roll
Printing Step: The Pe coated paper should be printed with different design and different color. So when we make the paper, there will be beautiful design with logo on the cups.
Cutting Step: In this step, you should decide the size of the cup, so we can cut the paper fan in decided size.
Paper Forming Step: You should put the paper fan on the machine, so the paper fan could be folded by the paper cup machine. Then the paper cups are formed, we can use the cups and enjoy delicious drinks.
Spare Parts of Paper Cup Machine
advantage:
1. Quenching treatment for all the machinery,so its hardness is much more better than others by 20%.
2. Divided box: 125’ type, it has the long life than 100’
4. Base board is nearly double than others,guarantee the machinery working stable ,longer using.
5. Our equipment of the heating use aluminum,it has better thermal conductivity.
7. Double Belt and Three Tier Chain make machine running stable, long strong use life.
After service
1 The CD and service&support guide booklet will be sent with machine to guide the installation process works,adjust the whole machine,production,avoid or solve the problem which the buyer will face.
2. Test run of the machine&training:
We will adjust the machine well for one week before the delivery, ensure the machine has the perfect performance.
3. We can dispatch technologists to buyer’s factory,guiding installation,adjustment for a period,the buyer in charge of the salary, traffic fee, boarding and lodging, communication.
4. We supply the consumable spare parts for free for two years use
Contact Information:
RUIAN MINGYUAN MACHINERY CO.,LTD
Email: mingyuanmachine@gmail.com