![]() |
MOQ: | 1 Set |
Price: | USD 5000USD to 8500USD Each set |
Packaging Details: | Export Standard Wooden Case |
Delivery Time: | 40 days |
![]() |
MOQ: | 1 Set |
Price: | USD 5000USD to 8500USD Each set |
Packaging Details: | Export Standard Wooden Case |
Delivery Time: | 40 days |
Customized Thermocol Disposable Plate Making Machine / Paper Dish Making Machine 3 KW
Brief Introduce for Mechanical type high speed Single working station paper plate machine :
Thermocol Disposable Plate Making Machine is developed and designed as the requirement of market. It is Mechanical Type which forming the plate control by the Cam no need air support, That is can help client save Save air (no need buy air compressor) and Save the electric charge.
Thermocol Disposable Plate Making Machine Main Technical Data:
1. Adopts Big Cam for control Mould forming the plate which no need buy air compressor(machine inbuilding air compressor), Help client save much electric charge and Air.
2. Suitable paper weight: 120--350 gsm ( suitable paper weight lower than 300GSM)
3. Speed of making paper plates: 50--60 pcs per minute(single working station)
4. Total power: 3 KW
5. Power source: 220 V50 HZ,60 HZ or other needed
6. The Weight For Paper Plate Machine: Single working station 400KG
7. Appearance size(L x W x H): Single working station 3500*1200*1300MM
Model No.: | Thermocol Disposable Plate Making Machine | Diameter Of Paper Plates: | 3.2—10 Inch |
---|---|---|---|
Row Material: | 4.Uncoated Paper, PE Coated Paper, White Cardboard Paper, Ivory Cardboard Paper | Paper Weight: | 120--350 Gsm |
Speed: | 50--60 Pcs Per Minute | Total Power: | 3 KW |
Power Source: | 8.220 V50 HZ,60 HZ Or Other Needed | Feature: | Eco Friendly |
New Mingyuan design High Speed paper Plate machine(Mechanical and Hydraulic) VS. Normal type Paper Plate machine design:
1. PLC intelligent control panel easy operation machine running
2, New design plate machine the paper moving under control by Iron Pressure road
3. New design Paper Plate Machine Just require very less air, We will direct inbuild air compressor, No need Client buy big air compressor from Market.
After service
1 The CD and service&support guide booklet will be sent with machine to guide the installation process works,adjust the whole machine,production,avoid or solve the problem which the buyer will face.
2.Test run of the machine&training:
We will adjust the machine well for one week before the delivery, ensure the machine has the perfect performance.
3. We supply the consumable spare parts for free for two years use